top of page

DP-2     Milestone Worksheets

MILESTONE 0

Team Charter

IMG_3039.JPG
IMG_3041.JPG
IMG_3040.JPG

Project Schedule

MILESTONE 1

Diagnosis

IMG_3042.JPG

MILESTONE 2

Concept generation

IMG_3156.jpg
IMG_3157.jpg

MILESTONE 3

Materials selection

Note: This milestone was completed before the concept generation so the following selections do not completely correspond with the final materials proposed for the prototype

Cross-Linked Polyethylene for the Acetabular Cup Lining

IMG_3048.JPG
IMG_3049.JPG
IMG_3050.JPG

Hydroxyapatite Networks Based on Hydroxyapatite Microtubes 

IMG_3045.JPG
IMG_3046.JPG
IMG_3047.JPG

MILESTONE 4

Preliminary Design Analysis

IMG_3051.JPG
IMG_3052.JPG
IMG_3053.JPG
bottom of page