Meeting Catalogue

March 7th, 2019

  • Discussed client profiles and potential solutions

  • Worked on generating customer requirements and engineering specifications

​

DS: March 8th, 2019

  • Met with the client and asked specific questions that would guide us towards creating a solution

​

March 13th, 2019

  • Completed QFD chart

  • Completed both individual and group brainstorming and discussed the design ideas in depth

​

DS: March 16th, 2019

  • All group members presented their own ideas

  • Proposed designs were reviewed and feedback was given amongst group members

​

March 18th, 2019

  • Discussed ideas and decided to pursue the water dispenser

  • Proposed ideas for the mechanics of the straw

​

March 20th, 2019

  • Created the low fidelity prototype for the first feedback session

​

March 21st, 2019

  • Evaluated all concepts in depth using go, no-go screening and a decision matrix

  • Used results from the screening  and design matrix, as well as subjective opinions, to decide that the water dispenser was the optimal idea to pursue

​

DS: March 23, 2019

  • Proposed the idea of a semicircular straw mechanism that would sit behind the client’s backrest and swivel out of a track to sit in front of their mouth in a preliminary design review

​

March 27th, 2019

  • Created a revised prototype based on the feedback from the first design review

  • Reconfigured the motor mechanism to a more simplistic system

  • Discussed logistics of the high fidelity prototype and steps to take moving forward

​

DS: March 29, 2019

  • Proposed the idea of a ¼-circle straw mechanism that would sit behind the client’s headrest and rotate over their head to sit in front of their mouth in a second design review

​

March 31st, 2019

  • Decided that a moving straw may not be the best potential solution

  • Discussed ideas for a robotic lever system that will lift a cup to the user’s face instead of a straw and separate water supply

 

April 1st, 2019

  • Worked in the design studio

  • Started working on the motor, the product design specification, and started a CAD for the cup holder design

​

April 2nd, 2019

  • Worked in the design studio

  • Redesigned the cup holder and the projecting arm that would attach to the motor

 

April 3rd, 2019

  • Worked in the design studio

  • Printed arm

  • Coded motor

  • Redesigned and printed the cup holder

 

DS: April 5th, 2019

  • Revised the support mechanism from a plate to a sliding pipe to a clamp

  • Printed the clamp

  • Started assembling the physical components

 

April 6th - 9th, 2019

  • Worked in the design studio assembling the prototype, programming the motor, adding to the PDS and gathering appropriate media for the prototype video and